Bona Mega Matt protects your flooring against spills and scuffs

Bona Mega Floor Varnish Matt (5L)

In Stock
£152.12 inc VAT

Free Saver Delivery on this item!

Bona's industry leading one component system famed for giving the performance of a two component finish. No mixing is needed as Bona Mega can be used straight from the bottle to protect flooring, making it the go to choice for theatre stages and other wooden floors.


Bona Mega outperforms other waterborne finishes when tested for ease of scuff removal, chemical resistance, scratch resistance, wear resistance and ease of stain removal. With a low VOC level and no side-bonding Mega is also perfect for surfaces with underfloor heating and plank floors. Available in four finishes to suit your needs.

    KEY BENEFITS

  • Superior protection against spills and scuffs
  • 1K simplicity with 2K performance
  • High resistance to wear
  • Highly recommended for underfloor heating
  • Excellent flow and levelling
  • Proven track record, still unique after 28 million litres and 136 million m² covered
  • Friction approved to DIN 18032:2
  • 1K simplicity with 2K performance
  • No side-bonding, ideal for underfloor heating, plank floors etc
  • Dispersion mainly consisting of plant-based oil
  • Excellent resistance to scuff marks and common chemicals
  • GreenGuard approved for low indoor emissions

Key Features of Bona Mega Floor Varnish Matt (5L)

Preparations

Prior to application the surface must be pre-treated with a waterborne primer from Bona. Ensure floor is acclimatised to its end-use environment, well sanded, dry and free from sanding dust, oil, wax and other contamination. Allow lacquer to reach room temperature, insert filter and shake the container thoroughly before use. Optimal application conditions are between 18-25°C and 30-60% relative air humidity. High temperatures and low humidity shorten, low temperatures and high humidity lengthen drying time. Minimum temperature for use is 13°C.

Treatment Schedule

Untreated wood:
1x Bona Waterborne Primer
Light sanding grit 150
2x Bona Mega
NB: It is recommended to not apply more than two full coats per day due to increased risk of excessive wood swelling.

Application

  • 1. Apply the lacquer using a Bona Roller. Roll with a smooth flowing motion alternately across and with the grain of the wood avoiding accumulations of product. Always maintain a “wet edge” to avoid overlaps. Allow to dry before applying further layers of lacquer. Anticipate slightly longer drying time for each layer that is applied.
  • 2. If necessary make an intermediate sanding using a screen or the Bona Scrad System grit P150 (or finer) and remove dust before applying the final layer of lacquer. Note: If the previous layer of lacquer has been allowed more than 24 hours drying time then an intermediate sanding is always required.

The floor will take light foot traffic approximately 8 hours after the final application. Allow the surface to dry for at least 1 week before covering with carpets or other floor coverings, or loading with heavy objects. Also avoid damp mopping the floor during this time.

Maintenance

Clean the floor with Bona Cleaner or Bona Wood Floor Cleaner and a microfibre pad. For maintenance and upkeep of the surface, floors can be overcoated at intervals with additional coats of lacquer. The frequency of this operation can be greatly reduced if Bona Freshen Up or Bona Wood Floor Refresher is applied periodically. This will restore the appearance of a dull floor whilst still allowing further coats of lacquer to be applied without the need for sanding the floor back to bare timber.
NB: The use of adhesive tape can damage the dry lacquer.

Specifications

  • Type of lacquer: Waterborne 1-component oil-modified polyurethane topcoat
  • Solids content: 32%
  • Coverage: 8 - 10 square metres per litre per coat.
  • VOC: Gloss, silkmatt, matt = max 60 g/litre, Extra matt = max 80g/litre
  • Resistance to wear: 5 mg/100 revolutions (SIS 923509)
  • Sheen (at 60°): Gloss 90%, Silkmatt 50%, Matt 25%, Extra Matt 9%
  • Dilution: If required, dilute with Bona Retarder (4%) for longer open time.
  • Drying time, until: - Ready for sanding/recoating: 2½-3 hours*
  • - Light use: 24 hours*

    - Full hardness: 7 days*

    *under normal climate conditions, 20°C/60% R.H.

  • Application tools: Bona Roller
  • Application rate: 8-10 m²/litre (120-100g/m²) per coat
  • Safety: Unclassified
  • Cleaning: Wipe tools free from residual material before cleaning with a minimum of water. Dried material can be removed with acetone.
  • Shelf life: 1 year from date of production in unopened original container
  • Storage/transport: The temperature must not fall below +5°C or exceed +25°C during storage and transport.
  • Disposal: Wastes and emptied containers should be handled in accordance with local regulations.
  • Certifications: GreenGuard
  • DIBt; safe building product
  • DIN 18032:2; approved friction for sports floors
  • EN 13501-1; Reaction to fire
  • EN 71-3: Application on children’s toys
  • EC1R: Very low emissions.
  • Frequently Bought Together

    Stage Depot - Scenic & Effects, Glazes & Coatings and Floor Suppliers